2015
 
December
The key equipment - 40MN Heave Stretching Machine - from SMS MEER right the first time, which built foundation of the aluminum plate production.
 
Roller Heart Quenching Furnace from EBNER produced high strength aluminum alloy plates by heating and  heat preservation and quenching process. The Roller Heart Quenching Furnace can produce extra-thickness aluminum alloy quenching plates, which improves the competitiveness of national aerial & space industry.
 
Trial run of the world leading Aging Furnace from EBNER was successful. It is a milestone in the completion of heating-treat process of hot plate mill.
 
November
2800mm 6-Rolls CVC Width Cold Mill successfully completed the first roll. It is another trial production of cold-rolling machinery followed by Casting House, Hot Rolling House and Cold-Rolling Unit A.
 
September
Rolling Mill #2 (R2) and Finishing Mill (FM) successfully produced square ingot into aluminum coil. It marks the success of FM hot commissioning. Meanwhile, it marks the entire hot rolling mill is completed, created the condition for the optimization of the rolling mill system reference in the future.
 
Casting Line #5 successfully manufactured the first piece of hard alloy round ingot, which greatly accelerated the hard alloy ingot production line in operation, also guaranteed continuous rolling of hot rolling mill.
 
August
4500mm Wide Plate Mill officially succeed after repeated rolling into aluminum ingots, which became the solid foundation for Finishing Mill (FM) hot commissioning and for continuous rolling  of entire strip line.
 
June
First load testing of 2350mm 6-Roll CVC Cold Mill succeed, which greatly promoted the process of further optimiziation of the cold rolling mill system functions.
 
2012
 
June
Tianjin Zhongwang Aluminium Co., Ltd. groundbreaking ceremony on site.
 
2011
 
December

Considering in the aspects of transportation, hydrogeological condition and area economic environment etc., we selected Wuqing Auto Industry zone as final address, it designed 10 square kilometers and has been proved by the State Council.

 
June
Tianjin Zhongwang Aluminium Co., Ltd. formally registered.
 